My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-03_REVISION - P2008046
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2010-04-03_REVISION - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:02 AM
Creation date
5/4/2010 7:57:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
4/3/2010
Doc Name
Modification application (MD-03)-non-confidential
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD3
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Nipple up BOP and wait on cement a minimum of 4 hours. Pressure test BOP. <br />• Drill out from surface casing with mud or aerated mud and a mud motor with a 12 '/4 -in <br />bit. Utilize the motor and surveys to stay vertical to a kick off depth of 664 feet. <br />Complete directional surveys every 40 feet. <br />• Directionally drill the 12 '/4 -in hole on an azimuth of 105° to an inclination of 45 Oat a <br />measured depth of 2174 feet. <br />• Circulate to clean and condition hole. Trip out of the hole. <br />• Run 9 5/8-in casing to 2161 MD. The bottom 80 feet (2081-2161 ft.) will be P-110, <br />53.59 casing and the remaining 2081 feet will be 36#, J55. <br />• Rig up for nitrogen aerated cement job. Cement casing to surface. <br />• Wait on cement for 12 hours; prepare to drill out of casing with 8 3/8-in bit with <br />directional tools. Test ranging tools in T-1P well. <br />• Drill cement shoe and 10 feet on new hole and trip out of the hole. <br />• Run CBL/CCL and evaluate results. Do a remedial cement job if warranted. <br />• If re-cementing was required, drill out the cement pocket below 9 5/8-in shoe and drill 3 <br />feet of new formation. <br />• Perform a formation Integrity Test to 1100 psi. <br />• Directional drill the lower lateral to intercept the T-1P well at a TVD of 2206 ft. and at a <br />vertical section of 740.9 ft. <br />• Open the lower lateral with a 14-in under reamer from casing shoe to TD. <br />• Drill sidetrack for upper lateral with 8 3/8" bit and mud motor to intercept the T-1P <br />well at a TVD of 2135 ft. <br />• Condition the hole and install the heater and production assemblies in both wells. <br />8
The URL can be used to link to this page
Your browser does not support the video tag.