Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Processing Waste <br />The temporary coal waste pile area located above the sediment was inspected. The clean water <br />diversion ditch around the waste pile and sediment storage area are maintained and functional. The <br />waste is properly contained. <br />Topsoil <br />The topsoil stockpile and construction material stockpile are stable with no signs of erosion. <br />Vegetation is beginning to green up and appears to be fairly well established on the stockpiles. <br />General Mine Plan Compliance <br />Overall, the McClane Canyon Mine site facilities are well maintained. No problems were noted at any <br />of the mine locations during this inspection.