Laserfiche WebLink
i . <br /> Colowyo C-1981-019 <br /> 12 Apr 10 <br /> Pg 414 <br /> General Mine Plan Compliance: - The 101 dragline was back on the edge of the East <br /> Pit highwall. No additional reclamation has been completed on the East Pit highwall <br /> and Colowyo has shut off power to the 101 . <br /> - The 102 dragline was down for scheduled maintenance. <br /> - The 103 dragline was in the West Pit doing F-Sedm pull-back work. <br /> - The 114 shovel operation was working on removing B3-Seam overburden in the <br /> South Taylor box-cut area. As stated above, the overburden material is being hauled <br /> to the final cut of the Section 16 Pit. **See pictures at the end of this report.** <br /> - The 115 excavator operation was removing B1 Seam overburden in the South Taylor <br /> box-cut area. As stated above, the overburden material is being hauled to the final <br /> cut of the Section 16 Pit. <br /> - Colowyo was removing coal from D-Seam in the South Taylor box-cut area. This <br /> coal was being hauled to the R3 stockpile. **See pictures at the end of this report.** <br /> Excess Spoil: - No material was being placed on either the West Taylor Fill or the East <br /> Taylor Fill. Neither of these fills has been used in 2010 for overburden material. All <br /> overburden material is being hauled to the final cut of the Section 16 Pit. Both the <br /> West Taylor Fill and East Taylor Fill remain stable at this time. <br /> This completes the 12 and 13 April 2010 inspection report for the Colowyo Mine. <br />