My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
4/26/2010 4:58:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C- 1996 -083 <br />Task 165 - Structural Demolition <br />Task: 165 <br />Site: Bowie No. 2 Mine <br />Date: 26 -Jan-10 <br />User: JRS <br />Permit Action: <br />2009 Midterm Review <br />County <br />Delta <br />Description: <br />Demolish and Remove All Structures <br />File Name: <br />C- 1996 -083 <br />Description <br />Reference <br />Quantity <br />Unit Cost <br />Total Cost <br />PORTAL LEVEL CONVEYOR AND RECLAIM (cont.) <br />Escape Tube <br />102 <br />CF <br />$0.2257 <br />$ 23.02 <br />Concrete Fan Housing <br />288 <br />CF <br />$0.2257 <br />$ 65.00 <br />FUEL AND OIL STORAGE TANKS <br />10,000 Gallon Tanks (2) <br />2 <br />EA <br />$1,105.0000 <br />$ 2,210.00 <br />- Pump Sludge from Tank Bottom <br />2 <br />EA <br />$357.0000 <br />$ 714.00 <br />- Dispose of Sludge in Approved Landfill <br />2,000 <br />GAL <br />$6.6000 <br />$ 13,200.00 <br />- Insert CO2 for Tank Cleaning <br />300 <br />LB <br />$2.2000 <br />$ 660.00 <br />- Haul Tank to Certified Dump <br />2 <br />EA <br />$1,160.0000 <br />$ 2,320.00 <br />500, 1,000, 1,500, 2,000 and 2,500 Gallon Tanks (5) <br />5 <br />EA <br />$473.5000 <br />$ 2,367.50 <br />- Pump Sludge from Tank Bottom <br />5 <br />EA <br />$214.5000 <br />$ 1,072.50 <br />- Dispose of Sludge in Approved Landfill <br />750 <br />GAL <br />$6.6000 <br />$ 4,950.00 <br />- Insert CO2 for Tank Cleaning <br />114 <br />LB <br />$2.2000 <br />$ 250.80 <br />- Haul Tank to Certified Dump <br />5 <br />EA <br />$725.0000 <br />$ 3,625.00 <br />CULVERT REMOVAL <br />12" - C -11 and C -13 <br />160 <br />LF <br />$2.2200 <br />$ 355.20 <br />18" - B1 -5, 137 -18, C1 -3, C7, C10, G1 -2, G4, F1, SAE 1, SAE2 <br />2,477 <br />LF <br />$2.4300 <br />$ 6,019.11 <br />- C -1322 <br />24" - C11 -12, C14, G3, F2, C42 <br />4,263 <br />LF <br />$3.2800 <br />$ 13,982.64 <br />30" - D1 <br />61 <br />LF <br />$4.6200 <br />$ 281.82 <br />36" - C4 -5, C13, C -111 <br />645 <br />LF <br />$5.1200 <br />$ 3,302.40 <br />Power Line Removal <br />6,350 <br />LF <br />$5.5800 <br />$ 35,433.00 <br />Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.