My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
4/26/2010 4:58:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C- 1996 -083 <br />Task 165 - Structural Demolition <br />Task: 165 <br />Site: Bowie No. 2 Mine <br />Date: 26 -Jan-10 <br />User: JRS <br />Permit Action: <br />2009 Midterm Review <br />County <br />Delta <br />Description: <br />Demolish and Remove All Structures <br />File Name: <br />C -1996 -083 <br />Description <br />Reference <br />Quantity <br />Unit Cost <br />Total Cost <br />Office and Bath House Superstructure <br />144,000.00 <br />CF <br />0.2257 <br />$ 32,500.80 <br />- Floor <br />6,000.00 <br />SF <br />1.7158 <br />$ 10,294.80 <br />- Footing <br />340 <br />LF <br />10.29 <br />$ 3,498.60 <br />Shop Superstructure <br />120,000.00 <br />CF <br />0.2257 <br />$ 27,084.00 <br />- Floor <br />5,000.00 <br />SF <br />1.7158 <br />$ 8,579.00 <br />- Footing <br />300.00 <br />LF <br />10.29 <br />$ 3,087.00 <br />Warehouse Superstructure <br />72,000.00 <br />CF <br />0.2257 <br />$ 16,250.40 <br />- Floor <br />3,000.00 <br />SF <br />1.7158 <br />$ 5,147.40 <br />- Footing <br />220.00 <br />LF <br />10.29 <br />$ 2,263.80 <br />Wash Bay Superstructure <br />30,000.00 <br />CF <br />0.2257 <br />$ 6,771.00 <br />- Floor <br />1,250.00 <br />SF <br />1.7158 <br />$ 2,144.75 <br />- Footing <br />150.00 <br />LF <br />10.29 <br />$ 1,543.50 <br />MCC Building Superstructure <br />8,316.00 <br />CF <br />0.2257 <br />$ 1,876.92 <br />- Floor <br />756.00 <br />SF <br />1.7158 <br />$ 1,297.14 <br />- Footing <br />120.00 <br />LF <br />10.29 <br />$ 1,234.80 <br />Covered Storage Superstructure <br />48,000.00 <br />CF <br />0.2257 <br />$ 10,833.60 <br />- Floor <br />2,400.00 <br />SF <br />1.7158 <br />$ 4,117.92 <br />- Footing <br />220.00 <br />LF <br />10.29 <br />$ 2,263.80 <br />Water Treatment Building Superstructure <br />3,360.00 <br />CF <br />0.2257 <br />$ 758.35 <br />- Floor <br />280.00 <br />SF <br />1.7158 <br />$ 480.42 <br />- Footing <br />68.00 <br />LF <br />10.29 <br />$ 699.72 <br />Fueling Station Superstructure <br />10,800.00 <br />CF <br />0.2257 <br />$ 2,437.56 <br />- Floor <br />2,000.00 <br />SF <br />1.7158 <br />$ 3,431.60 <br />- Footing <br />200.00 <br />LF <br />10.29 <br />$ 2,058.00 <br />Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.