Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 015 State : Colorado Permit/job# : C -96 -083 <br />Date : 0112612010 County :Delta Abbreviation :none _ <br />User: JRS Site: Bowie No. 2 Mine Filename :C083 -015 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2009 Midterm Review <br />Task description: Backgll and Regrade B -Seam Portal Bench <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type: Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Average push distance : 150 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient: 20.00 % (I <br />Average site altitude : 6,750 feet <br />Material weight: 2,900 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Ibs /LCY <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient : <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />Utilization % <br />Cost Breakdown: Ownership cost/hour: $89.77 <br />NA <br />Operating cost/hour: $128.30 <br />100 <br />Ripper op. cost/hour : $0.00 <br />0 <br />Operator cost/hour: $38.54 <br />NA <br />Total unit cost/hour : $256.60 <br />Total fleet cost/hour: $1,026.41 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume: 32,000 CCY factor : 1.165 <br />volume : 37,280 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient: 20.00 % (I <br />Average site altitude : 6,750 feet <br />Material weight: 2,900 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Ibs /LCY <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient : <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.54 <br />1.00 <br />0.79 <br />1.00 <br />0.19 <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd -rf) <br />(Cat HB) <br />(Cat HB) <br />HB) <br />__(Cat <br />(S /SU /U) <br />Adjusted unit production : 240.67 LCY /hr <br />Adjusted fleet production : 962.67 LCY /hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 38.73 Hours <br />Unit cost: $1.066 /LCY Total job cost: $39,749 <br />