My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
4/26/2010 4:58:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C- 1996 -083 <br />Task 165 - Structural Demolition <br />Task: 165 <br />Site: Bowie No. 2 Mine <br />Date: 26- Jan -10 <br />User: JRS <br />Permit Action: <br />2009 Midterm Review <br />County <br />Delta <br />Description: <br />Demolish and Remove All Structures <br />File Name: <br />C- 1996 -083 <br />Description <br />Reference <br />Quantity <br />Unit Cost <br />Total Cost <br />Wood Fencing from TR -11 <br />140 <br />LF <br />$2.0100 <br />$ 281.40 <br />12" PVC Pipe from TR -11 <br />42 <br />LF <br />$2.2200 <br />$ 93.24 <br />Misc. Steel Pipe from TR -11 <br />18 <br />LF <br />$2.2200 <br />$ 39.96 <br />TRAIN LOADOUT <br />Reclaim Conveyor Transfer Building <br />18,000 <br />CF <br />$0.2257 <br />$ 4,062.60 <br />- Floor <br />400 <br />SF <br />$1.7158 <br />$ 686.32 <br />- Footing <br />80 <br />LF <br />$10.2900 <br />$ 823.20 <br />Batch Weigh System <br />144,000 <br />CF <br />$0.2257 <br />$ 32,500.80 <br />Railroad Track <br />7,630 <br />LF <br />$8.2300 <br />$ 62,794.90 <br />- Storage Track <br />3,880 <br />LF <br />$8.2300 <br />$ 31,932.40 <br />- Bypass Track <br />615 <br />LF <br />$8.2300 <br />$ 5,061.45 <br />- Ballast <br />1,347 <br />CY <br />$3.7200 <br />$ 5,010.84 <br />Reclaim Conveyor Transfer Building <br />340 <br />LF <br />$16.5300 <br />$ 5,620.20 <br />- Elevated Portion <br />265 <br />LF <br />$41.3100 <br />$ 10,947.15 <br />- Elevated to Batch Weigh <br />1,200 <br />LF <br />$41.3100 <br />$ 49,572.00 <br />- Footing <br />7 <br />LF <br />$20.5900 <br />$ 144.13 <br />Remove Hazardous Waste from Site <br />20 <br />EA <br />$197.9500 <br />$ 3,959.00 <br />- Test Waste <br />20 <br />EA <br />$298.2800 <br />$ 5,965.60 <br />- Transport Waste to Dump <br />150 <br />MI <br />$7.0500 <br />$ 1,057.50 <br />- Dump Charges <br />6 <br />TON <br />$304.9500 <br />$ 1,829.70 <br />TR -24 Fan Structure <br />12,923 <br />CF <br />$0.2257 <br />$ 2,916.72 <br />- Floor <br />20 <br />SF <br />$1.7158 <br />$ 34.32 <br />- Footing <br />12 <br />LF <br />$10.2900 <br />$ 123.48 <br />Page 7 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.