Laserfiche WebLink
Bowie No. 2 Mine C- 1996 -083 <br />Task 165 - Structural Demolition <br />Task: 165 <br />Site: Bowie No. 2 Mine <br />Date: 26 -Jan-10 <br />User: AS <br />Permit Action: <br />2009 Midterm Review <br />County <br />Delta <br />Description: <br />Demolish and Remove All Structures <br />File Name: <br />C- 1996 -083 <br />Description <br />Reference <br />Quantity <br />Unit Cost <br />Total Cost <br />TRUCK LOADOUT /STOCKPILE AREA (cont.) <br />Loadout Storage Stacker <br />8,000 <br />CF <br />$0.2257 <br />$ 1,805.60 <br />- Tube <br />3,678 <br />SF <br />$1.7158 <br />$ 6,310.71 <br />- Footing <br />44 <br />LF <br />$10.2900 <br />$ 452.76 <br />Coal Loadout Bin <br />46,875 <br />CF <br />$0.2257 <br />$ 10,579.69 <br />- Footing <br />100 <br />LF <br />$10.2900 <br />$ 1,029.00 <br />Coal Reclaim Tunnel <br />160 <br />LF <br />$58.1900 <br />$ 9,310.40 <br />- 42" Escapeway <br />160 <br />LF <br />$13.7000 <br />$ 2,192.00 <br />- Fan Housing Building <br />288 <br />CF <br />$0.2257 <br />$ 65.00 <br />Loadout Substation <br />4,000 <br />CF <br />$0.2257 <br />$ 902.80 <br />- Floor <br />400 <br />SF <br />$1.7158 <br />$ 686.32 <br />- Footing <br />80 <br />LF <br />$10.2900 <br />$ 823.20 <br />- Transformer <br />1 <br />EA <br />$2,000.0000 <br />$ 2,000.00 <br />- Fencing <br />100 <br />LF <br />$2.4600 <br />$ 246.00 <br />Structure at Vent Shaft - Lap Slab <br />576 <br />SF <br />$1.7158 <br />$ 988.30 <br />- Wing Walls and Stem Walls <br />1,408 <br />SF <br />$14.2600 <br />$ 20,078.08 <br />- Wing Wall Footing <br />100 <br />LF <br />$14.2600 <br />$ 1,426.00 <br />- Fan and Evase <br />22,032 <br />CF <br />$0.2257 <br />$ 4,972.62 <br />- Shaft House <br />10,788 <br />CF <br />$0.2257 <br />$ 2,434.85 <br />Haul Road Pavement Removal <br />33,467 <br />SY <br />$3.9375 <br />$ 131,776.31 <br />- Disposal <br />5,578 <br />CY <br />$12.5100 <br />$ 69,780.78 <br />- Guardrail Removal <br />7,545 <br />LF <br />$5.1200 <br />$ 38,630.40 <br />Storage Shed at Topsoil Stockpile <br />76,500 <br />CF <br />$0.2257 <br />$ 17,266.05 <br />- Floor <br />5,100 <br />SF <br />$1.7158 <br />$ 8,750.58 <br />Page 6 of 12 <br />