My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-23_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2010-04-23_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:39 PM
Creation date
4/23/2010 3:22:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
4/23/2010
Doc Name
Letter, Application & Public Notice
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
PR4
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. J. Dudash -2- April 20, 2010 <br />Vegetation <br />Not applicable, no surface disturbance. <br />Hydrologic Monitoring <br />There are numerous springs and ponds that had been previously monitored by the <br />Bowie No.1 Mine that will be transferred to the Bowie No. 2 permit as baseline data. <br />Bond <br />The Bowie No. 2 Mine will assume responsibility for some drill roads and drill sites <br />permitted by the Bowie No. 1 Mine. Bowie No. 1 Mine TR-41 permitted the Terror <br />Creek Section 8 Road and BRL-1-03-01. Bowie No. 1 Mine TR-49 permitted the Pond <br />7-1 Road, DH-69 Road and drill sites BRL1-08-01 and BRL1-08-04. All of these items <br />except the DH-69 road are within the new Bowie No. 2 Mine permit boundary. The DH- <br />69 road crosses the new permit boundary so part of the road will remain with the Bowie <br />No. 1 Mine permit and part of the road will move to the Bowie No. 2 Mine permit. <br />The bond for Bowie No. 1, TR-41 was $17,704 all of which was transferred to the Bowie <br />No. 2 Mine. The bond for the Bowie No. 1 Mine TR-49 was $27,508.85 after adding the <br />credit taken for TR-44. TR-49 had 1.8 miles of road. The Bowie No. 1 Mine keeps 1.2 <br />miles of the road. The Bowie No. 2 assumes 0.6 miles of the road and the two drill <br />holes. The Bowie No. 2 Mine's portion of the TR-49 bond is $22,541 with the remaining <br />$4,968 applicable to the Bowie No. 1 Mine. Therefore the decrease in bond for the <br />Bowie No. 1 Mine is $40,244. <br />Please call if you have any questions. <br />Enclosures: <br />Volume 1 2.03-20, 35 & 36, <br />2.05, pages 8, 84, 136, <br />2.10, page 1 <br />4.03.3, page 24, <br />Volume IV Map 4-1, Table 3 (pg. 1) <br />Note: Table 3 has been revised to reflect that Pond & Spring 20 is no longer monitored <br />as part of the Bowie No. 1 Monitoring program <br />Volume IX Map 9-2 <br />Sincerely, <br />Jim Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr.
The URL can be used to link to this page
Your browser does not support the video tag.