My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-21_PERMIT FILE - M2010008
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010008
>
2010-04-21_PERMIT FILE - M2010008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:28 PM
Creation date
4/22/2010 7:19:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010008
IBM Index Class Name
PERMIT FILE
Doc Date
4/21/2010
Doc Name
Adequacy Review #1
From
DRMS
To
Eastern Colorado Aggregates, R.L.L.L.P.
Email Name
JLE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.) Will a sterile/non - competitive covercrop of sorghum-sudangrass be established at <br />the site to aid native grass establishment as recommended by the NRCS in the <br />paragraph below the seed mixture? The Division recommends following the NRCS <br />recommendation. Or, will mulch be used at the site? If so, what type will be used and <br />how many tons per acre will be applied? <br />12.) Will the perimeter side slopes be graded to a 3:1 horizontal to vertical ratio in Phase <br />A of the mining operation prior to mining phase B? Concurrent reclamation of the <br />perimeter slopes will likely lower the financial warranty amount. <br />13.) It appears the topsoil and overburden stockpiles will be in place for over one <br />growing season before it is re-spread on a reclaimed area. Please explain how it will be <br />protected from wind and water erosion? The Division recommends seeding the <br />stockpiles will a cover crop, such as western wheatgrass. <br />14.) Will the grass seed mixture be planted with a grass drill, broadcast seeder or by <br />another means? If the seed mixture will be broadcast seeded the seeding rate proposed <br />by the applicant will need to be doubled. <br />6.4.6 EXHIBIT F - Reclamation Plan Map <br />15.) This map must be signed by the registered land surveyor, professional engineer or <br />qualified person who prepared it. <br />16.) Please indicate on the map the date the map was prepared. <br />17.) Please indicate on the map what scale was used to create the map. <br />18.) Please portray the proposed land use for the entire affected land. This can be a <br />simple note stating the site will be reclaimed to rangeland. <br />6.4.7 EXHIBIT G - Water Information <br />19.) Where will the water be obtained for the operation? Please specify the source of <br />the water and provide documentation the water is allowed to be used for this type of <br />operation. <br />6.4.8 EXHIBIT H - Wildlife Information <br />20.) The letter from the Division of Wildlife submitted for this exhibit indicates blasting <br />during spring nesting and calving season may impact the local wildlife in the area. The <br />Division of Wildlife requested that no blasting be done between mid-March through
The URL can be used to link to this page
Your browser does not support the video tag.