My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-15_HYDROLOGY - M1979097
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1979097
>
2010-04-15_HYDROLOGY - M1979097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:04:04 PM
Creation date
4/15/2010 12:11:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979097
IBM Index Class Name
HYDROLOGY
Doc Date
4/15/2010
Doc Name
Combined Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br />4, Bo d and- Freem Au a Cation Station. Greeley agrees to use best . <br />efforts to design, obtain; Division of Water Resources approval for, and construct the <br />Boyd and Freeman. Augmentation Station at its expense for use to deliver A <br />ugmentatiof •. • <br />Water commencing in 4ri12049. The Boyce, and Freeman Atigmentatiori Station'shal£` , s' <br />be owned-by Greeley, is preliminarily proposed to he located on Greeley property north' <br />of the Rover Run dog park, and shall be designed and conistructed to deliver water at a, <br />flow rate -equal to or <br />greater than Lafarge's pro rata share of the total rate of flow <br />contently decreed to the Boyd and Freeman Ditch and available under the Boyd and <br />Freeman Ditch Water Rights. Lafarge agrees to, cooperate with Greeley ui obtaining <br />approvals for the Boyd and Freeman Augmentation Station. <br />xF . <br />5. Negotiations for Gravel P'tr Storage Facilities. The parties agree to pay <br />one-half each of the costs of a study to be perfoxmeci by Lyman-Henn or another <br />mutually acceptable consultant to evaluate the feasibility and cost of constructing and <br />operating water stn <br />' rage facilities and associated structures from gravel pits located, ' <br />or to be located on Lafarge's 35thAvenue Pit site, or on other nearby sited in which . ; <br />Lafarge has obtained or may in the future obtain a gravel mining lease, including without <br />limitation Greeley's F Street Reservoir site. The precise scope of work of the Addy shall <br />be agreed upon by the parties in advance. The parties estimate that such st dy will take; <br />approximately four monf to complete. Following the completion of such study, the <br />parties will discuss the study and a possibI- second transaction involving Greeley's <br />aoquiktiori of such facilities or the right to construct and, operate them in exchange for <br />Crreeley's long-term lease of additional Augmentation ater to Lafarge or other <br />considcrit4ou. Greeley shall have the exclusive right to negotiate with Laarge • ` <br />concerning such'acquisitiob'for 12 months following the parties' receipt of a eh study.'..'. <br />6. l .afarae Junior Water, Storage Rights. Lafarge agrees to use best efforts-"" <br />(as furtherlimited herein) to obtain a decree in the application for junior conditional <br />,water storage rights for 35th Avenue Reservoir currently pending in Case No. 98CW476,; <br />Water Division No.1, with decreed uses that include a) the replacement of evaporative <br />losses from all sand and gravel mining sites.ourrently owned by Lafarge, from other sand <br />and gravel mining sites located or to be located between the headgetes of Greeley Canal., <br />No. 3 and the Ogilvy Canal in which Lafarge may leave or assume any responsibility ;fo <br />replacernebit of such losses, or from the ,1~ Street Reservoir, 8th Street Reservoir, and <br />Flatb-nn/.Greeiey West ? it sites, and b) the replacement of return flow obligations decreed <br />or to be decreed as conditions of the. approval of any change of water right that makes <br />such right legally available for the replacement of any such losses, including changed <br />water rights originally decreed to Greeley Canal No. 3 and associated with shares of kr-. <br />stock in the Greeley Irrigation; Company. Greeley agrees not to oppose the entry of a <br />decree in-such application that contains these terms, and to discuss.with Lafarge possible <br />strategies to obtain such a decree. If Lafarge obtains such a decree and the parties <br />successfully negotiate a subsequent transaction involving Greeley <br />'s; acquisition of the <br />Tight to water storage facilities described in the preceding paragraph, Lafarge and Greeley <br />agrees to negotiate in good faith, as part of such transaction, Greeley's acquisition of a - <br />pro rata interest in the decreed junior conditional rights upon payment by Greeley of such <br />4 <br />e 1 • <br />.j <br />I
The URL can be used to link to this page
Your browser does not support the video tag.