My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-15_HYDROLOGY - M1979097
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1979097
>
2010-04-15_HYDROLOGY - M1979097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:04:04 PM
Creation date
4/15/2010 12:11:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979097
IBM Index Class Name
HYDROLOGY
Doc Date
4/15/2010
Doc Name
Combined Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- ? 3 <br />3. Transfer and Leaseback of Boyd and Freeman Ditch Water Rights. As..-I-6--.1 <br />full consideration and rent for the permanent lease of the Augmentation Water described <br />in Section 1 (subject to an assignee's possible obligation to pay the storage and pumping <br />fee upon assignment-described in Section 2), Lafarge agrees to transfer, convey and <br />assign by bargain and sale deed, stock assignment and irrevocable stock power to Greeley <br />all of its right, title and interest in water rights decreed to the Boyd and Freeman Ditch,"' = <br />and associated with its 550 shares of stock in the Boyd Irrigation Company (the "Boyd'.. <br />and Freeman Ditch Water Rights") within 15 days of the effective date of this <br />Agreement. Lafarge shall also execute covenants prohibiting irrigation of its 35th Avenue <br />Pit Site with any water available under shares of stock in the Boyd Irrigation Company :. <br />except as may temporarily be required to allow Lafarge to meet its reclamation <br />obligations under the mining permit for the 35th Avenue Pit Site, • ba partial satisfaction` <br />of Greeley's Augmentation Water lease obligation in Section 1 hereof, Greeley may elect <br />to make Augmentation Water available to Lafarge tinder the Boyd and Freeman Ditch:, , <br />Water Rights for use in Lafarge's Substitute Water Supply Ilan to replace evaporative'E <br />water losses or other water depletions occurring, at Lafarge's 35th Avenue Gravel Pit <br />Site, or other sand and gravel mining sites located between the headgates of Greeley <br />Canal No. 3 and the Ogilvy Ditch (the "Adjacent Sites") during the April-October <br />period.. Lafarge agrees to use best efforts to continue. to obtain any necessary <br />approvals <br />related to the use of water available under the Boyd and Freeman Ditch Water Rights ins:: <br />any renewals of such Substitute Water Supply Plan; provided, however, that nothing- <br />herein shall affect Greeley's obligation to deliver Augmentation Water from other - <br />sources in the event that a Substitute Water Supply Plan using the•Boyd and Fteeman <br />Ditch Water Rights is not approved by the State Engineer's omce. Unless otherwise <br />required' by law, absent C3reeley's written approval, Lafarge agrees not to seek court <br />adjudication of any plan for augmentation involving Augmentation Water'to be released' <br />from Greeley during the April-October period until the later of a) ten fall Lease Years <br />after the effective date of this agreement. or b) completion of all required mine . '_ <br />reclamation activities on the 35th Avenue Pit Site and the Adjacent Sites. Lafarge shall <br />give Greeley prompt written notice of any such legal requirement. for Lafarge to seek <br />such court adjudication prior to the times specified above, and shall not file an <br />application seeking such court adjudication for a minimum of 90 days following the <br />sending of such notice unless such ninety (90) day period is waived by Greeley in its sole <br />discretion. Upon receipt of such notice, Greeley and Lafarge shall confer with respect tp <br />what specific Greeley water supplies, consistent with Greeley's other obligations_under <br />this Agreement including without obligation its obligation to provide Augmentation <br />Water, Greeley shall allow to be included as supplies from which Greeley will make <br />water available to Lafarge in such application. lf, prior to the tboac speetfied in <br />. <br />subsections a) and b) of this Section, the State Engineer's Office denies a Substitute <br />Water Supply Plan submitted by Lafarge that relies in whole or in part upon the Boyd aid <br />Freeman Ditch Water Rights, Greeley may request that Lafarge file and prosecute-an <br />administrative or judicial appeal of such denial; proceedings at the initial level of any <br />such appeal shall be at Lafarge's expense, while proceedings at any further level of <br />appeal, if any, shall be at Greeley's expense. ;r <br />3 ` <br />r. .
The URL can be used to link to this page
Your browser does not support the video tag.