My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-20_GENERAL DOCUMENTS - C1981015
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981015
>
2009-03-20_GENERAL DOCUMENTS - C1981015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:37 PM
Creation date
4/14/2010 10:55:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Date
3/20/2009
Doc Name
PKA-9-1149 Change Orders
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flo- <br />1 <br />UHANGE ORDER COLORADO DIVISION OF <br />Whereas, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a RECLAMATION, MINING <br />sufficient uncommitted balance thereof remains available for encumbering and subsequent this <br />payment of contract under AND SAFETY <br />Encumbrance Number />�i' .. in Fund Numbe Appr GBL G f�//'! 1313 Sherman St. Rm. 215 <br />— _ Denver, CO 80203 2273 <br />�lh 303 866 -3567 <br />Project Name Date <br />Fruita Mine Maintenance Bond Revocation Project March 31, 2009 <br />Contractor Name <br />Bid # <br />K & P Property Design <br />PKA -9 -1149 <br />Contractor Address <br />236 S 3 Street <br />Agreement # <br />Montrose, CO 81401 <br />Change Order # 3 <br />Project Manager <br />Erica Crosby <br />The following changes are hereby made to the Ag reement include the cost/time adjustment for each change <br />1. Provide and install polyurethane foam (PUF) per the specifications and under the direction of the Project Manager to repair <br />the Fruita portal (noted in Emergency Change Order #5). The Additional Item ( #11 on bid sheet) is being used to <br />safeguard the <br />portal 10 CY FUF @ $426.00/CY for a total of $4,260.00), so there is no increase to the cost on the bid sheet. $0.00 <br />2. Use 1 hour of machine time (noted on Additional Item #7 on bid sheet) to fill, crush and backfrll the outlet of the pond 36 -inch <br />culvert for safety reasons (noted in Emergency Change Order #5). One hour of equipment time will be converted to <br />L CMP <br />perform the work 1 hour @ $100.00 /hour , so there is no increase to the cost on the bid sheet. $0.00 <br />3. Extend the completion date an additional 7 days (to April 13, 2009) due to inclement weather this spring (noted in Emergency <br />Change Order #5). There is no increase in cost to the bid sheet for the additional time. $0.00 <br />4. Construct 2'/2 check dams (road /fill check dams) per the specification in the bid document on the lower east side of the main <br />drainage channel (noted in Emergency Change Order #6). Funding for these check dams will be from the remaining balance of <br />Additional Item #7 ($400.00 equipment rental hours) and the remaining balance of Additional Item #8 ($116.00 for additional <br />rock). Additional Items #7 and #8 will be converted to check dam construction; therefore, there is no increase in the total price <br />on the bid sheet. $0.00 <br />Justification <br />Portal was not backfilled correctly by the previous mine operator, therefore, PUF is needed to reinforce the closure for safety and <br />environmental reasons. The outlet of the culvert (36° inch CMP pipe) remains exposed and could present a hazard; therefore, <br />[ crushing and filling the outlet will secure the culvert. <br />CHANGE TO AGREEMENT PRICE: <br />Original Agreement Price: <br />$23,560.00 <br />Current Agreement Price adjusted by previous Change Orders: <br />$33,745.00 <br />The Agreement Price due to this Change Order will be increased by: <br />$0.00 <br />The new Agreement Price including this Change Order will be: <br />$33,745.00 <br />CHANGE TO AGREEMENT TIME: <br />This Agreement time will be increased by: <br />7 Days <br />The date for completion of all work will be: <br />April 13, 2009 <br />' Recomme ed by„ <br />Date: <br />DRMS Project ana er Date: <br />Accepted by ,Princi R resentative <br />Date: 3 ✓� Date: <br />for State Buildings and <br />,Contractor <br />Y: <br />Approved Real Estate Programs <br />A Date: Date: <br />`t Project Su ervisor <br />,DRMS <br />__ •for the State ContrnVVar <br />
The URL can be used to link to this page
Your browser does not support the video tag.