Laserfiche WebLink
r <br />EMERGENCY CHANGE ORDER <br />COLORADO DIVISION OF <br />RECLAMATION, MINING <br />COLOR A DO <br />DIVISION OF <br />&SAFETY <br />RECLAMATION <br />1313 Sherman St. Rm. 215 <br />MINING <br />Denver, CO 80203 2273 <br />SAFETY <br />(303) 866 -3567 <br />Project Name: <br />Date: <br />Fruita Maintenance Bond Revocation Project <br />March 22, 2009 <br />Contractor Name: <br />Bid M <br />K & P Property Designs <br />PKA -9 -1149 <br />Contractor Address: <br />Agreement #: <br />236 S. 3r #219 <br />Montrose, CO 81401 <br />Project Manager: <br />Change Order* 4 <br />Erica Crosb <br />Use this form to authorize work changed due to changed conditions within the scope of the Agreement. Emergency Change Orders resulting in increased <br />Agreement price or Completion time must be approved by a formal Change Order WITHIN 14 days. The following changes are authorized at the direction of the <br />DRMS PROJECT MANAGER. <br />Item No. <br />DESCRIPTION AND JUSTIFICATION OF CHANGES <br />$ Increase /Decrease <br />1. <br />Install a rock channel 115 feet long as specified by the Project Manager below the <br />$1,955.00. <br />constructed road check dams. The channel will be installed per the specifications <br />noted in the bid document and the approved unit cost of $17.00 /lin.ft. The change <br />will be an increase of $1,955.00. <br />2. <br />Install a rock channel 80 feet long and 5 check dams as specified by the Project <br />$2 360.00. <br />Manager in the western channel. The channel will be installed per the specifications <br />noted in the bid document and the approved unit cost of $17.00 /lin.ft. and the <br />approved $200.00 /check dam. The change will be an increase of $2,360.00. <br />3. <br />Install a rock channel 110 feet long as specified by the Project Manager in the <br />$1,870.00. <br />confluence of the two drainage channels. The channel will be installed per the <br />specifications noted in the bid document and the approved unit cost of $17.00 /lin.ft. <br />The change will be an increase of $1,870.00. <br />4• <br />With the additional work included in the project, new areas will need to be <br />$4,000.00. <br />revegetated. An additional 1 acre may be disturbed. Revegetation of the new areas <br />will be per the specifications in the bid document and the approved cost of <br />$4,000 /acre (pricing will be based on the actual cost of disturbance measured by the <br />Project Manager. The change will be an increase of $4,000.00. <br />Net Change in Agreement Price: $10,185.00 Net Change in Agreement Time: 10 da <br />This document 4411 become an amendment to the Agreement. All Agree ent provisions shall apply. <br />Approved by : , DRMS Project <br />Date: 3 f <br />Mana er <br />Accepted by: Contractor <br />Date: 3 3 O Q <br />As of 01/08/09 / <br />