EMERGENCY CHANGE ORDER <br />COLORADO DIVISION OF <br />COLORADO <br />RECLAMATION, MINING <br />ulvlsioN oe <br />& SAFETY <br />RECLAMATION <br />MINING <br />1313 Sherman St. Rm. 215 <br />Denver, CO 802032273 <br />SAFETY <br />(303) 866 -3567 <br />Project Name: <br />Date: <br />Fruita Maintenance Bond Revocation Project <br />March 20, 2009 <br />Contractor Name: <br />Bid #: <br />K & P Property Designs <br />PKA -9 -1 <br />Contractor Address: <br />236 S. 3 #219 <br />Agreement #: <br />Montrose, CO 81401 <br />Project Manager: <br />Change Order #: 3 <br />Erica Crosb <br />Use this form to authorize work changed due to changed conditions within the scope of the Agreement. Emergency Change Orders resulting in increased <br />Agreement price or Completion time must be approved by a formal Change Order WITHIN 14 days. The following changes are authorized at the direction of the <br />DRMS PROJECT MANAGER. <br />Item No. <br />DESCRIPTION AND JUSTIFICATION OF CHANGES <br />$ Increase /Decrease <br />1. <br />Construct a ditch 49 feet long * 2 feet deep * 4 feet wide on the old <br />$0.00 <br />exploration road above the fill as specified by the Project Manager. The <br />hand labor cost of $384.00 ($48 /hr. * 8 hours) will be converted from a <br />portion of additional rip -rap cost (Item #8 on the additional which totals <br />$500.00). There is no increase to the total cost since $384.00 will be used <br />from Item #8. <br />The contractor will perform additional excavation work at the sediment pond <br />$0.00 <br />as directed by Project Manager. Any excavated organic materials will be <br />hauled off site for disposal. Excavated areas will be filled to blend with <br />2. <br />adjacent contour, and reseeded as per specifications. Machine time, <br />estimated at 5 hours of Track Excavator at $100 per hour, will be used to <br />fund this work. There is no increase to the total cost since $500.00 will be <br />used from Item #7, Equipment Rental. <br />Net Change in Agreement Price: $0 Net Change in Agreement Time: 2 da <br />This document II become an amendment to the Agreement. All Agree ent rovisions shall apply. <br />/ � 6 Approved by : , DRMS Project <br />Manager <br />Date: 2� <br />A - ,Contractor <br />Date: 3 a y 0 <br />As of 01/08/09 <br />