Mr. Berhan Keffelew, DRMS <br />April 9, 2010 <br />Page 3 <br />Reclamation accomplished during the preceding year: Approximately 24 acres of <br />disturbance associated with the Cresson Project were reclaimed in 2009 as described <br />above. <br />New disturbances anticipated during the upcoming year. Continued development <br />of the Main Cresson, East Cresson (including backfilling in the ECME and Wildhorse <br />areas, and development of the WHEX area), associated haul roads, new Ironclad <br />Access Road, sediment control measures, topsoil stockpiles, and other ancillary <br />disturbances required to support these activities will continue in 2010. <br />Mining in the Wildhorse area of the East Cresson has been completed and backfilling <br />activities within Wildhorse Mining Area were initiated in 2009. Backfilling in the East <br />Cresson (Altman and Wildhorse portions) will continue in 2010. Other construction <br />activities associated with Amendment No. 9 (including Phase 5 of the VLF) have been <br />initiated and will continue throughout 2010. <br />Reclamation anticipated during the upcoming year. Approximately 10 to 20 acres <br />of miscellaneous sites consisting of topsoil stockpiles, sediment ponds, and exploration <br />disturbances are planned to be reclaimed this year. <br />Financial Warranty: <br />CC&V and DRMS have agreed on an additional warranty amount for Amendment No. 9. <br />The warranty amount of $54,280,734 will be posted in phases, which is consistent with <br />CRS 34-32-117(4)(b)(1). The first phase, or construction phase, required a warranty <br />which amounted to $36,594,665. It was posted on December 23, 2008. The second <br />phase in the amount of $17,686,069 will be posted once the Phase 5 VLF is constructed <br />and certified in the year 2011. With the additional warranty, the revised estimated <br />liability amount equals $98,994,665. <br />Per 2CCR 407-1, 407-4, and Rules 1.15(1)(a), St. Paul Fire and Marine Surety Bond <br />No. JZ7711, in the amount of $33,331,600.00, was submitted to DRMS on July 16, <br />2004. <br />On December 23, 2008, DRMS accepted the submittal of a rider to the Scotiabank <br />Irrevocable Letter of Credit No. to increase the amount to $40,700,000 for <br />the Cresson Project. <br />In addition, Liberty Mutual Surety Bond No. was increased to $7,922,271.21 <br />on April 30, 2004. These financial instruments, providing a total financial warranty of <br />$81,953,871.21, have been accepted by the DRMS and continue to demonstrate the <br />sufficiency of the value of the Cresson Project Financial Warranty.