Laserfiche WebLink
of mine expansion will be dependent upon location of ore deposits as determined by surface <br />development drilling. <br />(e) The Last Chance Mine and facilities are locked and in a standby and maintenance mode <br />as allowed by the intermittent operation status. Startup should require less than two <br />weeks and Nuvemco anticipates five years of active mining on the property (at nine <br />months /year to allow for weather and other delays in operations). <br />(f) Nuvemco estimates a waste rock dump of about 1 acre in size containing about 50,000 <br />tons of mined waste rock. The balance of the mined waste rock will be left in abandoned <br />sections of the mine. <br />2 <br />