Laserfiche WebLink
..:.... ..... . <br />«. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-CAT 933C (2003) $69.47 1 $69.47 $69.47 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $69.47 $69.47 <br />.:::. .......... <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Canon City <br />Transportation Cycle Time : Non- Total one-way travel distance : 2.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.07 0.07 Total non-roadable mob/demob cost $1,759.75 <br />Return time (hours) = 0.07 0.07 * two round trips with haul rig <br />Loading time (hours) = 3.00 NA Total roadable mob/demob cost ** : $9.26 <br />Unloading time (hours) = 2.00 NA ** one round trip, no haul rig <br />Subtotals = 5.13 0.13 <br /> <br /> <br />JOB TIME AND COST . <br />Total job time : <br />10.27 hours <br /> Total job cost : $1,769