Laserfiche WebLink
CIRCES Cost Estimating Software <br />IP <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 004 State :Colorado <br />Date : 0410812010 <br />User : BMK <br />Permit or other job action :Amendment <br />Task description : Blob/ demob <br /> <br />..: .................................... ........ <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis : <br />1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />L?/1I I I r%%A C LIT <br />Machine <br />Description Wei ht/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8U (200 53.17 $46.56 $125.45 1 $172.01 $125.45 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $172.01 $125.45 $0.00 <br />sheet 1 of 2 <br />County :Fremont <br />Site :Mackenzie Pit <br />Permit/job #:M-1980-224 <br />Abbreviation :none <br />Filename :M224-004