My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-08_INSPECTION - M1977094
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977094
>
2010-04-08_INSPECTION - M1977094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:35 PM
Creation date
4/12/2010 10:59:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977094
IBM Index Class Name
INSPECTION
Doc Date
4/8/2010
Doc Name
Insp Rpt
From
DRMS
To
Morgan Sand & Gravel, Inc.
Inspection Date
3/15/2010
Email Name
MAC
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID #: M-1977-094 <br />INSPECTION DATE: -i/15/1n INSPECTOR=S INITIALS: NA AI' <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The Reclamation Plan fails to address how final grading of the site will be done to control 4 /23 /10 <br />erosion and siltation of the affected lands, to protect areas outside the affected land from <br />slides and other damage as required by Rule 3.1.5(3). <br />PB or PV: _P_B_ <br />TOPIC(S): --RS- <br />Corrective actions are to: The Operator shall submit a Technical Revision describing how final <br />grading of the site will control stormwater runoff as it enters the drainage channels. The <br />Technical Revision shall include a map, with contour lines, depicting the final grade of the <br />site. The Technical Revision shall describe how stormwater runoff will be routed into both of <br />the drainage channels that leave the mine site. The Technical Revision shall be submitted to <br />the Division on or before April 23, 2010.
The URL can be used to link to this page
Your browser does not support the video tag.