My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-08_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-04-08_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:36 PM
Creation date
4/9/2010 9:09:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
4/8/2010
Doc Name
2nd Incompleteness/Adequacy Letter
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
application is complete. The Division may address the information contained in the <br />discussion during technical adequacy. <br />Rule 4.06 - Topsoil <br />25. This item is considered complete. Colowyo has provided a narrative in Section 4.06 <br />that minimally addresses this item. <br />26. This item is considered complete. Colowyo has provided three copies of the Topsoil <br />Handling Map, Map 28C as required in Rule 2.05.3(5). <br />Rule 4.08 - Use of Explosives <br />27. This item is considered complete. Colowyo has included map 26B, which is the <br />Blasting Analysis Map along with Exhibit 14, Item 8 - Pre-blast Structure Locations. <br />Pursuant to Rule 4.08.2(1), Colowyo is required to provide written notification to all <br />residents or owners of dwellings or other structures within one-half mile of the permit <br />area at least 30-days prior to blasting. While this portion of the pre-blast survey <br />remains outstanding, it is not required for completeness. <br />28. This item is considered complete. Colowyo has provided three certified copies of <br />Map 26B - Blasting Analysis Map-Collom with the PR-03 application. <br />29. This item is considered complete. Colowyo has provided the requested descriptions <br />of the oil and gas facilities within 500 feet of blasting. The Division may have <br />technical adequacy questions regarding these facilities and the blasting plan for the <br />Collom area. <br />Rule 4.13 - Contemporaneous Reclamation <br />30. This item remains incomplete. While Colowyo has provided a brief description of the <br />operation for the Collom Lite Pit, more detail will need to be included regarding the <br />sequencing of mining and reclamation for the operation in order for the Division to <br />evaluate the requested variance from contemporaneous reclamation. The discussion <br />will need to provide details regarding the mine plan and reclamation plan and the <br />related 250,000,000 cubic yard temporary overburden stockpile. Colowyo will need <br />to discuss, in detail, the proposed methods for and timing of the reclamation in order <br />to ensure compliance with Rule 4.13. <br />Rule 4.14 - BackfMing and Grading <br />31. This item remains incomplete. While Colowyo has provided three copies of Map <br />29B - Spoil Grading-Collom, the map is not complete and appears to be in <br />contradiction with Map 23B - Mine Plan-Collom Area. First, there are no dates for <br />the backfilling in the Little Collom X Pit. Second, there are no dates for the regrading <br />of the facilities area. Third, there are no dates for the final reclamation of the <br />Colowyo Mine C-1981-019 page 8 of 11 8 April 2010 <br />Permit Revision 03 - Collom Permit Expansion
The URL can be used to link to this page
Your browser does not support the video tag.