Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> T <br /> _. ' -d•.., ` MAA 13 2011E ��""'+'✓F <br /> installation of 18lT waterline, Fish creek crossing on Right <br /> Haybales staked in Fishcreek downstream from crossing <br /> TCC has not provided As-built certifications to the Division for this reservoir yet. Piping to the 6MN <br /> million gallon tank has been completed. But no filling of the 6MN million gallon tank has commenced. <br /> 6MN sediment pond is frozen and not discharging, and the snow level in the pond is well below the <br /> discharge level. Brian stated that TCC had reinforced the berm but TCC has not begun construction of the <br /> new spillway and discharge channel <br /> Many of the ponds throughout the mine site are thawing and beginning to discharge. Pond Dwas <br /> discharging 0.44 on the staff gauge. The staff gauge is flapping around in the discharge water turbulence <br /> and needs addition anchoring. <br /> Pond E was discharging clear,about 1 '/s"on the v-notch weir.TCC requests a winter exemption from <br /> MSHA for MSHA pond inspections for Pond A, D, and G. <br /> Fish Creek Bore Hole ponds were not discharging to Fish Creek at Site 115. TCC reported that yesterday <br /> the freeboard at the FCVS was greater than 3011. TCC was pumping water to the Fish Creek borehole <br /> treatment ponds. <br /> 4 of WHITE-File YELLOW -Operator PINK-Specialist <br />