Colowyo C-1981-019 <br /> 24 Mar 10 <br /> Pg 6/6 <br /> Excess Spoil (cont.): This elevation is just below the currently approved post-mining <br /> topography of 8,150' for this area. Colowyo needs to ensure that they are not <br /> placing material above the final approved topography (Map 19B - Postmining <br /> Topography - South Taylor Area) or stockpiling any additional material in the Section <br /> 16 Pit final cut area. While the Division realizes that Colowyo has proposed a plan to <br /> stockpile up to 12 million cubic yards of South Taylor overburden in this area JR-81), <br /> this plan has not yet been approved and cannot be implemented until the Division <br /> has approve it and the public comment period has passed. **See pictures at the <br /> end of this report.** <br /> - The C-C' underdrain area of the East Taylor is still active, but Colowyo has not used <br /> the area as a dump for the last several months. Colowyo is working on the fifth lift <br /> and is above the pile's final approved topography. Colowyo will use this area as a <br /> temporary overburden stockpile and will return all of the material above the <br /> approved final topography to the South Taylor Pit. The current elevation of the East <br /> Taylor Fill is 8,154', which is well below the currently approved maximum elevation for <br /> the pile (the temporary stockpile portion of the pile) of 8,300'. <br /> - Colowyo is also using the B-B' underdrain area of the West Taylor Fill for excess spoil <br /> placement, although the majority of the overburden material has been going to the <br /> Section 16 Pit final cut area for the past two months. Colowyo is working on the <br /> second lift of the fill at this time. They have moved down towards the toe (and the <br /> West Taylor Pond) but remain at least 600 feet from the final toe. No overburden <br /> material has been placed up gradient from this area into the A-A' underdrain. **See <br /> Pictures at the end of this report.** <br /> - Colowyo has submitted Technical Revision 81 to the Division. This revision proposes <br /> to change the volume and configuration of the East Taylor Fill, the West Taylor Fill and <br /> the temporary overburden stockpiles. This revision was deemed complete on 28 <br /> December 2009 and is currently under review by the Division. <br /> This completes the 24 and 25 March 2010 inspection report for the Colowyo Mine. <br />