Laserfiche WebLink
28. Colowyo has indicated that a copy of Map 26B - Blasting Analysis Map-Collom is <br />pending. Please submit three certified copies of Map 26B - Blasting Analysis Map- <br />Collom with the PR-3 application. <br />Colowyo Response: <br />Map 26B - Blasting Analysis Map - Collom has been included in this package. <br />29. Pursuant to Rule 4.08.4(7)(b), blasting shall not be conducted within "500 feet of <br />facilities including, but not limited to, disposal wells, petroleum or gas-storage <br />facilities, municipal water-storage facilities, fluid-transmission pipelines, gas or oil- <br />collection lines, or water and sewage lines." Map 11 B - Well and Drillhole <br />Locations, shows three locations identified as "Colorado Oil and Gas Registered <br />Facility Locations". Please provide the Division with a detailed description of each <br />of these facilities (contained in the permit text in the appropriate part of Section 4.08) <br />to ensure compliance with Rule 4.08.4(7)(b). <br />Colowyo Response: <br />Section 4.08.4(7)(b) has been amended <br />Rule 4.13 - Contemporaneous Reclamation <br />30. On page 117 of Section 4.13 Colowyo states that "...backfilling, grading, topsoil <br />replacement and revegetation of land disturbed by the mining activities in the Collom <br />Lite and Little Collom X pits shall occur as contemporaneously as practicable..." <br />Given the nature of the multi-seam mining, as experienced in the East Pit, West Pit <br />and South Taylor Pit of the current mine, contemporaneous reclamation in the Collom <br />area will not be possible. A 225 million ton temporary overburden stockpile for the <br />duration of mining is proposed for the Collom mine area. As such, a description of <br />the operations and a request for a variance from contemporaneous reclamation is <br />necessary including a detailed analysis of the operation and a justification giving the <br />reasons the variance is needed. <br />Colowyo Response: <br />Section 4.13 has been amended. A formal request for variance from <br />contemporaneous reclamation is being asked for with this revision package. <br />Rule 4.14 - Backfilling and Grading <br />31. Colowyo has indicated that a copy of Map 29B - Spoil Grading-Collom is pending. <br />This map is necessary to evaluate compliance with Rules 4.13 and 4.14. Three <br />certified copies of Map 29B - Spoil Grading-Collom are needed to consider the <br />application complete. <br />Colowyo Response: <br />Map 29B - Spoil Grading Collom has been included in this package. <br />Colowyo Mine C-1981-019 page 12 of 16 25 March 2010 <br />Permit Revision 03 - Collom Permit Expansion