My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-15_PERMIT FILE - M2010016
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010016
>
2010-03-15_PERMIT FILE - M2010016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:34 PM
Creation date
3/30/2010 10:42:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010016
IBM Index Class Name
PERMIT FILE
Doc Date
3/15/2010
Doc Name
New 112c application
From
Grand Junction Pipe & Supply Co.
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />MINING PLAN <br />EAST BRADBURY PIT <br />The East Bradbury Pit is located on a ridge approximately one half mile south of Kannah <br />Creek on the east side of State Highway 50. <br />The total area of the affected land of the proposed permit contains 129 acres. This total <br />includes 29.3 acres of Permit No. M-2000-157 which is a 111 Permit. All but 3.5 acres <br />of this permit were disturbed when the pit was originally mined. <br />Mining will be done using front end loaders, hydraulic excavators, dozers and trucks. The <br />mining operation consists of stripping the topsoil and overburden above the aggregate <br />deposit The stripped material will be stockpiled and later used for backfill of slopes. The <br />top 4 to 6 inches of the soil will be stockpiled separately from the overburden for later <br />use in the reclamation of the disturbed area. The aggregate deposit will be mined using <br />front end loaders, hydraulic excavators and trucks. <br />The mined aggregate will be crushed on site into construction material for roads, pipe, <br />bedding and other related materials. An asphalt plant may operate on the site if there is an <br />overlay project on Highway 50 in the vicinity of the pit. <br />No mining will take place until mid 2011 or early 2012. The pit will be mined in phases <br />starting where the mining was discontinued under Permit No. M-2000-157 and proceed <br />to the east along the top of the ridge. Each phase will contain between 8 and 16 acres and <br />take 2 to 3 years to remove the processed gravel in each phase. The estimated life of the <br />mine is 15 to 20 years. <br />The depth of the topsoil and overburden is three to four feet. The depth of the gravel <br />deposit varies from 8 to 12 feet with the underlying material being shale. <br />The primary and only product to be mined is sand and gravel.
The URL can be used to link to this page
Your browser does not support the video tag.