Laserfiche WebLink
a) For K-Pit Mining, does TMI plan to reduce the gradients of slopes (by excavating <br />material) in K-Pit which are currently steeper than 181 and will haul roads be <br />designed with maximum cut and fill slopes of 3I3:1V when located in or above the I- <br />Seam? <br />b) AAI seems to indicate (Page 8) that in lieu of placing spoils in the K-Pit Buttress, they <br />may be used in reclamation of the AE-Pit. Revised permit pages submitted with TR- <br />106 do not mention this possibility. Please clarify the list of proposed locations for <br />placement of excess spoil from the K-Pit. <br />If you have any questions feel free to contact me. (303) 866-3567 ext. 8134 <br />Sincerely, <br /> <br />Jason Musick <br />Environmental Protection Specialist