Laserfiche WebLink
Denison Mines (USA) Corp. <br />Van 4 Mine - Ore Storage Pad <br />of applied loads on the wrinkle. Should the wrinkle need removing, the lower down- <br />slope edge of the wrinkle shall be cut, overlapped and repaired. Both ends of the wrinkle <br />repair shall be patched. Caution must be taken in removing any wrinkles. Wrinkles are <br />needed to allow for future contraction of the geomembrane liner, especially in cold <br />weather. <br />D. Construction Equipment <br />1. Construction equipment or vehicles with steel tracks shall not be permitted on the <br />geomembrane. Other equipment such as portable generators and power centers shall be <br />permitted if the support apparatus is protected from damaging the liner, and if care is <br />taken to prevent leaking lubricants from damaging the geomembrane. <br />3.04 AS-BUILT DRAWINGS <br />A. The ENGINEER shall prepare as-built drawing reflecting the actual installation of <br />geomembrane liner, including the location of all seams and the location of all repair work. In <br />addition, a copy of the complete documentation package will accompany the as-built drawing. <br />END OF SECTION <br />0 <br /> <br />JOB NO. 64986. 10.1