My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-18_REVISION - M1997032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997032
>
2010-03-18_REVISION - M1997032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:47 PM
Creation date
3/25/2010 4:06:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997032
IBM Index Class Name
REVISION
Doc Date
3/18/2010
Doc Name
Response to Technical Adequacy comments
From
Denison Mines
To
DRMS
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Denison Mines (USA) Corp. <br />Van 4 Mine - Ore Storage Pad <br />F. When a seam sample is removed from the panel being fabricated the resulting hole will be <br />repaired with a patch with a minimum of a one inch bonded area around the patch, and the patch <br />will be rounded on all corners. <br />G. Factory fabricated geomembrane panels are packaged accordion folded on a sturdy wooden <br />pallet designed for fork lift truck access. Smaller panels (i.e. less than 500 lbs.) can be rolled on <br />a fiber core, and placed on a pallet. <br />H. All panels will be packaged with a protective, black stretch wrap or cardboard cover to protect <br />the panel from weather or shipping damage. <br />PART 3 EXECUTION <br />3.01 SUBGRADE PREPARATION <br />A. Preparation of the subgrade shall be as specified in the EARTHWORK specification. <br />3.02 GEOMEMBRANE PLACEMENT <br />A. Weather Conditions <br />1. Geomembrane placement shall not proceed at an ambient temperature below 35-F or <br />above 120-F unless the INSTALLER demonstrates, to the satisfaction of the <br />ENGINEER, that procedures can be implemented which will result in the proper <br />installation. <br />• 2. Geomembrane placement shall not be performed during precipitation, excessive moisture, <br />in an area of ponded water, or excessive winds that adversely affect the geomembrane <br />placement. <br />B. Method of Placement <br />1. All panels of the geomembrane shall be factory seamed at the MANUFACTURER'S <br />facility. <br />The ENGINEER shall inspect each panel after placement for damage and/or defects. <br />Defective or damaged panels shall be replaced or repaired, in accordance with Paragraph <br />Repair Procedures. <br />3. The INSTALLER shall avoid dragging the geomembrane sheets on the bedding material. <br />4. All geomembrane shall be anchored as shown on the Drawings and consistent with <br />MANUFACTURER's recommendations. <br />5. Personnel working on the geomembrane shall not smoke, wear damaging shoes or <br />involve themselves in any activity that may damage the geomembrane. <br />6. All edges of the geomembrane shall be properly weighted to avoid uplift due to wind. <br />• 7. Vehicular traffic across the geomembrane shall not be allowed. <br />All damaged areas shall be recorded and located on the as-built drawings by the <br />ENGINEER. <br />JOB NO. 64986. 10.1
The URL can be used to link to this page
Your browser does not support the video tag.