Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Fuel Tanker, 6x4, 210 HP $81.57 9 $734.11 $734.11 <br />-Lube Truck, 6x4, 210 HP $96.85 1 $96.85 $96.85 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : <br />......... ......... ......... ..... $830.96 <br />......... ......... $830.96 <br />...... . <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Ft. Collins <br />Transportation Cycle Time : Non- Total one-way travel distance : 33.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.10 1.10 Total non-roadable mob/demob cost $0.00 <br />Return time (hours) = 1.10 1.10 * two round trips with haul rig <br />Loading time (hours) = NA Total roadable mob/demob cost ** : $1,828.11 <br />Unloading time (hours) = NA ** one round trip, no haul rig <br />Subtotals = 2.20 2.20 <br /> <br />.: :.:.:.:...................:.:::...... <br />JOB TIME AND COST ....................:..... .........::.::.:::.::.::.::.::.::.... . <br />Total job time : <br />2.20 hours <br /> Total job cost : $1,828