Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILI2 <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining, And Safety <br />Task #: 023 State : Colorado Permit/job #:P2008043 <br />Date : 0311712010 County: Weld Abbreviation :none <br />User : ACS Site :Centennial Uranium Project Filename :P043-023 <br />Permit or other job action : Modification Md-03 <br />Task description :Deliver fuel, p( <br />tube, oil, filter service <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45