Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Replace topsoil from stockpile to drill pads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />in MR-306 <br />Horsepower: 405 <br />Shiftbasis : 1 perday <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $204.53 <br /> <br /> <br />MATERIAL QUANTITIES ............ :::.:::::::::::::::.::::::::.:.::::.::.......................... ................................ <br />........................... <br />Initial Swell Loose <br />volume : 2,500 BCY factor : 1.250 volume : 3,125. LCY <br /> <br />Source of estimate d volume : Division estimate based on MR-306 submittal <br />Source of estimated swell factor : CAT Handbook <br /> <br />............ <br /> <br />HOURLY PRODUCTION <br />_ .........................._ ;:::;::.:.:: <br />Job Condition Correction Factors <br />.::......._._.._._.......: <br />::: ::::.. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-r!) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,750 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Div Packed <br />Adjusted unit production <br />Adjusted fleet production <br />406.85 <br />406.85 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 7.68 Hours <br />Unit cost : $0.503 /LCY Total job cost : $1,571