Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action :Permit Renewal RN-05 <br />Task description : Regrade light-use roads approved in MR-306 <br />......................................................................... . <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />volume : 6,000 BCY <br />factor : 1.250 volume : 7,500 LCY <br />Source of estimated volume: Division estimate based on MR-306 submittal <br />Source of estimated swell factor : CAT Handbook <br />.................................................................................... ..... Factors .;:.;:.........................:.....Source <;:::. <br />HOURLY PRODUCTION Job Condition Correction <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient <br />Average site altitude <br />8.00 % (pos) <br />7,750 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (l shif Ida) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.83 (Cat HB) <br />Altitude : 0.95 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.31 <br /> <br />Adjusted unit production : 215.68 LCY/hr <br />Adjusted fleet production : 215.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 34.77 Hours <br />Unit cost : $0.948 /LCY Total job cost : $7,112