My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-02-22_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
3/18/2010 3:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/22/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
User <br />TAK <br />Site : West Elk Mine <br />Filename : 0007-205 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Dozer operating cost/hour : $98.84 100 <br />Ripper operating cost/hour : $7.51 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $212.05 Total fleet cost/hour : $848.19 <br /> <br />.................................................................................... <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 18.36 acres Rip depth (ft) : 2.00 Volume : 59,242 BCY or CCY <br /> <br />Source of estimated quantity: MR applications <br />Source of estimated load factor :NA <br /> <br />:.:::....................... <br />HOURLY PRODUCTION .............. <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,458.87 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 7,000 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.762 acres/hour Adjusted unit production : 2,040.86 cu. yds./hour <br />Unadjusted production : 2,458.87 cu. yds./hour Adjusted fleet production : 8,163.45 cu. yds./hour <br /> <br />XXX <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 7.26 hours <br />Unit cost : $0.104 per cu. yd. Total job cost : $6,155 <br /> X.x
The URL can be used to link to this page
Your browser does not support the video tag.