Laserfiche WebLink
Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description : Replace topsoil from stockpile to MR-218 roads and drill pads <br />xx. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br />.................................................................. <br />MATERIAL QUANTITIES ....................... ......... <br />Initial Swell Loose <br />volume : 14,326 CCY factor : 1.125 volume : 16,117 LCY <br />Source of estimated volume: Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Operator skill : 0.75 <br />Average push distance : 75 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,514.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 679.94 LCY/hr <br /> Adjusted fleet production : 2,719.77 LCY/hr <br />:: <br />JOB TIME AND COST .............. ....................................................... <br />Fleet size : 4 Dozer(s) Total job time : 5.93 Hours <br />Unit cost : $0.301 /LCY Total job cost : $4,848