Laserfiche WebLink
Agency or organization name : Colorado Division Of M <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Regrade MR-218 borehole access roads <br />HOURLY EQUIPMENT COST <br />Reclamation And Safety <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br /> <br />.......... <br />:::::' ................. <br />MATERIAL <br />QUANTITIES <br /> <br />......................................................... <br />........................................ ................... <br /> <br />.............. . <br />................................................................ ............................... ....................... <br />..... <br />Initial Swell Loose <br />volume : 15,607 CCY factor : 1.165 volume : 18,182 LCY <br /> <br />Source of estimated volume :Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION::;: :::.......... :. <br />................................... _.................:.;:ondition Correction Factors <br /> <br /> <br />Job Co <br /><:....... <br /> <br />.....................: <br />: <br />...................... <br /> <br /> <br />........ <br />....... <.:ur.;:;:...... <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 441.76 LCY/hr <br /> Adjusted fleet production : 1,767.04 LCY/hr <br /> <br />..' ........ <br />JOB TIME AND COST <br /> <br /> <br />.............:.................:.......:...... <br />...................................... <br />. <br /> <br /> <br />............................................................... <br />................................................................ <br /> <br /> <br />.............................. <br />............................... <br /> <br /> <br />........................... <br />............................ <br />Fleet size : 4 Dozer(s) Total job time : 10.29 Hours <br />Unit cost : $0.463 /LCY Total job cost : $8,418 <br />