Laserfiche WebLink
Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />volume : 2,261 CCY factor : 1.125 volume : 2,544 LCY <br /> <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 408.83 LCY/hr <br /> Adjusted fleet production : 1,635.31 LCY/hr <br /> <br /> <br />JOB TIME AND COST ............ <br />Fleet size : 4 Dozer(s) Total job time : 1.56 Hours <br />Unit cost : $0.500 /LCY Total job cost : $1,273 <br />xx X: