Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action : Regrade mud pits associated with MR-212 <br />Task description : Regrade ditch DCW-7 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source: (CRG) <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br />::::..:........................................ <br />MATERIAL QUANTITIES ....................... ................................................................. <br />Initial Swell Loose <br />volume : 444 BCY factor : 1.330 volume : 591 LCY <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />_..... __ ............................._... _ ...._.......:......... _..:...._ _.._.... <br />HOURLY PRODUCTION Job Condition Correction Factors ::.;::.:Source ,::.. <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 6,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.43 <br />Adjusted unit production : 916.60 LCY/hr <br />Adjusted fleet production : 3,666.40 LCY/hr <br />Total job time : 0.16 Hours <br />Unit cost : $0.223 /LCY Total job cost : $132 <br />xxx.