Laserfiche WebLink
User <br />TAK <br />Site : West Elk Mine <br /> <br />Filename :0007-187 <br />Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description : Regrade dewatering borehole drill pads from MR-212 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,666 BCY factor : 1.330 volume : 8,866 LCY <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />X :X. <br /> <br />_........_....__ .................__ ......... _.__ ..................._..... <br />....................................................... <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> <br />.;::,;:°::,: . <br />Source <br />Average push distance : 200 feet <br />Unadjusted hourly production :--0O.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (/ <br />Average site altitude : 6,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift/day) <br />Spoil pile : 0.80 (fnd-ro <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.36 <br />Adjusted unit production <br />Adjusted fleet production <br />248.74 LCY/hr <br />LCY/hr <br />994.95 <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 8.91 Hours <br />Unit cost : $0.822 /LCY Total job cost : $7,290