My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-02-22_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
3/18/2010 3:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/22/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume <br />Area : 0.37 acres Rip depth (ft) : 2.00 Volume <br />NA <br />1,194 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Division estimate <br />Source of estimated load factor :NA <br />.....::.::: .:.... :::.:::::::::::.::::::::.::::::.:................................. . <br />HOURLY PRODS iiCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />NA feet/second <br />NA cu. yds./hour <br />2.00 feet/pass <br />7.67 feet/pass <br />75.00 feet/pass <br />88.00 feet/minute <br />0.25 minutes/pass <br />0.719 acres/hour <br />Unadjusted production : 2,319.45 cu. yds./hour <br />JOB TIME AND COST <br />Unadjusted production <br />per selected method <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />Adjusted unit production <br />Adjusted fleet production <br />2,319.45 cu. yds./hour <br />6,36o <br />1.00 <br />feet <br />(Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />1,925.14 cu. yds./hour <br />7,700.57 cu. yds./hour <br />Fleet size : 4 dozer(s) Total job time : 0.16 hours <br />Unit cost : $0.110 per cu. yd. Total job cost : $131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.