Laserfiche WebLink
Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume <br />Area : 0.37 acres Rip depth (ft) : 2.00 Volume <br />NA <br />1,194 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Division estimate <br />Source of estimated load factor :NA <br />.....::.::: .:.... :::.:::::::::::.::::::::.::::::.:................................. . <br />HOURLY PRODS iiCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />NA feet/second <br />NA cu. yds./hour <br />2.00 feet/pass <br />7.67 feet/pass <br />75.00 feet/pass <br />88.00 feet/minute <br />0.25 minutes/pass <br />0.719 acres/hour <br />Unadjusted production : 2,319.45 cu. yds./hour <br />JOB TIME AND COST <br />Unadjusted production <br />per selected method <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />Adjusted unit production <br />Adjusted fleet production <br />2,319.45 cu. yds./hour <br />6,36o <br />1.00 <br />feet <br />(Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />1,925.14 cu. yds./hour <br />7,700.57 cu. yds./hour <br />Fleet size : 4 dozer(s) Total job time : 0.16 hours <br />Unit cost : $0.110 per cu. yd. Total job cost : $131 <br />