Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And <br />Permit or other job action : Permit Renewal RN-05 <br />Task description :Rip Dewatering Borehole Access Road <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 0.11 acres Rip depth (ft) : 2.00 Volume : 355 BCY or CCY <br /> <br />Source of estimated quantity :Division estimate <br />Source of estimated load factor :NA <br /> <br />:.:::............. <br /> <br />HOURLY PRODUCTION ...................... .................................... ........................................................................ ......................... ............. .. .. <br />... ... <br /> <br />........... <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,083.21 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 6,300 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 50.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.646 acres/hour Adjusted unit production : 1,729.06 cu. yds./hour <br />Unadjusted production : 2,083.21 cu. yds./hour Adjusted fleet production : 6,916.26 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 0.05 hours <br />Unit cost : $0.123 per cu. yd. Total job cost : $44