Laserfiche WebLink
User <br />TAK <br />Filename :0007-173 <br />Agency or organization name : CDRMS <br />Permit or other job action : Regrade mud pits associated with MR-212 <br />Task description : Replace topsoil from stockpile to drill pad #4 from MR-236 <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour: $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br />::::::::......:::::........:::::.... <br />MATERIAL QUANTITIES ........:......:......::::::::::.:::::::.:::::::::::.::::::::::::::.:................................. ................................. ........................... <br />Initial Swell Loose <br />volume : 506 BCY factor : 1.250 volume : 632 LCY <br /> <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION <br />Job Condition Correction Factors .:::..::...: <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,690 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 947.64 LCY/hr <br /> Adjusted fleet production : 3,790.58 LCY/hr <br /> <br />::.....::......:: <br />JOB TIME AND COST ...........::::::.:.............................. ................................ ............................ <br />Fleet size : 4 Dozer(s) Total job time : 0.17 Hours <br />Unit cost: $0.216 /LCY Total job cost : $137 <br /> - <br />Site : West Elk Mine