Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action :Permit Renewal RN-05 <br />Task description : Regrade road to drill hole #4 from MR-236 <br />HOURLY E <br />QUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />volume : 674 BCY factor : 1.330 volume : 896 LCY <br /> <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />.. <br />. <br />HOURLY PRODUCTION .....:: <br />::.:. <br />Job Condition Correction Factors <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,690 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU.IU) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 441.76 LCY/hr <br /> Adjusted fleet production : 1,767.04 LCY/hr <br /> <br />::::::.............................................. <br />JOB TIME AND <br /> <br />COST ....................................... ............................................................... <br /> <br />::::::: <br />........................... <br /> <br />::::........ <br />....................... <br />......... <br />Fleet size : 4 Dozer(s) Total job time : 0.51 Hours <br />Unit cost : $0.463 /LCY Total job cost : $415 <br />