My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-18_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-03-18_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:57 PM
Creation date
3/18/2010 1:31:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
3/18/2010
Doc Name
Second Adequacy Response
From
Peabody Energy
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
permitting process. Additionally this and related issues should have been addressed <br />much earlier in the PAP review process. <br />Additional Supporting Information for Response to Comment 64 <br />SAGE CREEK MINE <br />MATERIAL BALANCE <br />NOVEMBER 5, 2009 SITE DESIGN <br />The November 5, 2009 site design required 778,799 bank cubic yards (bcy) of <br />cut, which resulted in 910,607 loose cubic yards (Icy) of fill, including 140,574 Icy of <br />topsoil in stockpile. The cut material swelled 16.9% resulting in 131,809 Icy of excess <br />material above the original surface, which was included in the postmining topography <br />(PMT) surface. Grading to the PMT surface required 798,042 Icy of cut and fill, <br />including the 140,574 Icy of topsoil removed from stockpile. 112,565 Icy of the original <br />fill used to grade the site did not have to be rehandled during reclamation grading. <br />Sage Creek Mine Postmining Topography Design Volume Summary <br /> 11-5-09 SITE CONSTRUCTION DESIGN <br /> Fill Cut Balance Swell <br />North 356,985 82,838 <br />South 392,821 771 <br />Portal 20,228 695,189 <br />Topsoil Stockpile 140,574 <br /> 910,607 778,799 131,809 116.9% <br />Assumptions <br />1 Volumes calculated using MODEL=>TRIANGLE SURFACE=>POLYGON <br />VOLUME <br />Original Surface: TOPO_ORIGINAL _091016.00t <br />Final Surface: TOPO SITEDESIGN 091016v2.00t <br />2 75 percent of material used in site grading is spoil. <br />3 20% swell <br />4 1 foot of topsoil salvaged. <br /> Excess <br /> Material from <br /> Site <br /> Fill Cut Construction <br />Vulcan GRIDCALC <br />outputs (kcf) 20,923 (21,211) <br />Cubic yards 774,938 (785,586) <br />Topsoil stockpile <br />(cy) 140,574 <br /> 915,512 (785,586) 129,926 116.5% <br />12
The URL can be used to link to this page
Your browser does not support the video tag.