Laserfiche WebLink
Processing Waste <br /> The Refuse Disposal Pile (RDA) was generally snow-covered and was traversed on foot. No <br /> slope instability or changes since the last inspection were noted. The operator has <br /> expressed an interest in terminating the quarterly inspection requirement for the RDA as <br /> allowed by Rule 4.10.2(2)(a). A final inspection report will be conducted prior to requesting <br /> approval of the termination of quarterly inspections. <br /> Revegetation <br /> Generally, winter conditions prevail at the site. However, south-facing aspects are beginning <br /> to show signs of the coming growing season, with small ground-hugging (orbs and grasses <br /> beginning to sprout. Soil moisture is excellent due to persistent snowfall this winter. <br /> Offsite Support Facilities <br /> Due to extremely poor road conditions, outlying areas including the Newlin Creek topsoil <br /> footprint area and the South Fan area were inaccessible. These areas will be inspected at <br /> the first opportunity when access improves. <br /> Overall, the site appeared in good condition for the winter season. <br /> 4 <br />