Laserfiche WebLink
• <br />• • <br />(6) Reservoir Surface Area and Dam Dime rsions <br />(a) Surface area of reservoir at high water line: 0.6 acres <br />(b) Maximum Dam Height: 13 feet. Maximum height from emergency <br />spillway to the lowest natural ground surface along the longitudinal <br />centerline of the dam: 10 feet (non jurisdictional). <br />(c) Length of Dam: 300 feet. <br />(7) Land Ownership: <br />The land upon which the pond will be located :.s owned by Fairview Land Corp., PC <br />Box 3406, Boulder, CO 80305. <br />C. Idaho Mill Settling Pond <br />An off-channel pond lined with 36 mil RPP, with a capacity of approximately 1.5 AF. Pond to <br />be filled by diverting water from the MM, either through the mill, or by bypassing the mill, and <br />by pumping Settling Pond water back to the mill inlet for re-use. <br />(1) Location of structure <br />• <br />Township 36 North Range 11 West N M P M La Plata Countv Colorado <br />In the SW 1/a NE 1/a NW 1/s, Section 28, T36N, R11W, N.M.P.M., being 756 feet from the <br />North section line and 1401 feet from the Wes,: section line of said Section 28. <br />(GPS Coordinates Zone 12, Northing 4138227, Easting 758979 meters. Unaveraged) <br />(2) Source of Storage Water <br />a) Surface water draining out of Idaho Mine Portal into unnamed channel tributary <br />to the La Plata River, diverted through the BU). <br />b) Water hauled from outside the La Plata River Basin. <br />(3) Appropriation Date- <br />November 30, 2006. <br />(4) Amount claimed: <br />1.5 acre feet conditional, with fill and continuous refill through water diverted from the <br />IMO and water recirculated from the pond back through the mill. Up to 10.8 acre feet <br />annually may be diverted from the JMD for milling purposes and storage in the Idaho <br />Mill Settling Pond to be used and re-used to extinction. See Paragraph 8(A)(4), <br />of 1 <br />0