Laserfiche WebLink
Attachment A, Technical Revision to the May Day Mine Permit, September 12, 2009. 11 of 19 <br />r ` S <br />(a) Surface area of reservoir at high water line: 0.6 acres <br />(b) Maximum Dam Height: 13 feet. Maximum height from emergency <br />spillway to the lowest natural ground surface along the longitudinal <br />centerline of the dam: 10 feet (non jurisdictional). <br />(c) Length of Dam: 300 feet. <br />Land Ownership: <br />The land upon which the pond will be located is owned by Clements. <br />B. Wildcat Augmentation Pond #2 <br />An off-channel pond lined with 36 mil RPP, with a capacity of approximately 2.5 AF of active <br />storage. Pond to be filled by diverting water from the aViD. <br />(1) Location of structure <br />Township 361\'orth Range 11 West N M P M La Plata Countv Colorado <br />In the SE % SE 1/4 NW 1/., Section 28, T36N, R.11 W, N.M.P.M., being 2019 feet from. the <br />North section line and 2129 feet from the West: section line of said Section 28. <br />• (GPS Coordinates Zone 12, Northing 4137849. Easting 759213 meters. Unavcraged.) <br />(2) Source of Stora a Water <br />(a) Surface water draining out of Idaho Mine Portal into unnamed channel <br />i tributary to the La Plata River, diverted through the EVID. <br />(3) Appropriation Date: <br />November 30, 2006. <br />(4) Amount claimed: <br />2.5 acre-feet, conditional, with right to fill and refill up to 4 times per year in priority <br />totaling not more than 10.0 acne-feet. Rate of diversion when filling pond limited to 1 <br />c.f.s. See Paragraph 8(A)(4). <br />I <br />(5) Proposed Uses <br />i <br />Augmentation of out-of-priority diversions from the IMD for mining and milling uses on <br />Idaho Millsite. <br />i <br />_? 4