Laserfiche WebLink
"- <br />I-The current excavation at Site C will be extended north and to the east to complete excavation of <br />the site where topsoil was removed by the previous claimant at Site B. The excavation will also <br />be extended to the west boundary of the permit site. If this is completed, backfill will begin on <br />the northwest area of the claim and proceed east. Remaining area in this part to include all of Site <br />B is 0.65 acre. Removed gravel will be stored on the north west edge of the disturbance until <br />processing is complete. <br />Anticipated 2010 Disturbances: <br />Approximately 0.25 acre will be disturbed during the 2010 season. <br />Areas that have experienced heavy mineral trespass will be made safe, buried and temporarily <br />reseeded. <br />-Proposed 2010 Reclamation: <br />A small portion of previous Site B, up to 1,000 square feet may be ready for reclamation. If so, it <br />will be recontoured and reseeded. <br />Sufficiency of Bond: <br />A reclamation bond of $ 8,477 is held by the State of Colorado. This bond is set aside to cover <br />annual reclamation efforts for this mining permit. <br />Respectfully submitted, <br />JOSEPH L. DORRIS Atch <br />Owner/Operator Topaz Mountain Gem Mine Site Maps