Laserfiche WebLink
Y <br />6 .4.3 - Exhibit C Pre-Mining and Mining Maps. <br />(a) Within the application narrative it is noted the mine is on and surrounded by <br />BLM lands. <br />(b), Map C-4 notes all man-made structures within 200 feet of the proposed <br />affected area. <br />(c), Maps supplied give sufficient details for topography <br />(d), Maps clearly define total area involved in the operation <br />(e), Arial photography overlay on maps notes typical juniper/ pinion cover. <br />(f), Map C-5, and D-1 note stormwater control flows and sources. An unnamed <br />minor drainage area is noted next to the permit area, northwest of the portal <br />that was affected by pre-law mining activities. Stormwater controls must <br />address impacts to this area. <br />(g), All structures appear to be noted. <br />(h) Information is provided in Exhibit 1. <br />6.4.4- Exhibit D, Mining Plan <br />General Notes: <br />Please clarify that the ore load out area is included in the ore storage area. The <br />load out area must be included any radiometric surveys and reclamation must <br />bring the area back to the same baseline as noted for the ore storage pad. <br />The drilling plan is noted to occur in three potential phases. A Notice of Intent is not <br />required nor allowed within a permitted area. If activities occur within the approved <br />affected areas of a reclamation permit, which the proposed plans appear to address, <br />they are considered part of the mine plans and are addressed accordingly. The <br />applicant must commit to a maximum number of holes at any given time and the <br />Division will bond for that activity. The operator would not need to submit for <br />additional approvals provided the number of holes and the areas of interest do not <br />exceed any approvals given under current review. <br />Please fully describe the anticipated depth and lengths of mine workings as currently <br />planned. <br />(a) adequate per narration <br />(b) adequate per narration <br />(c) general plan is adequate, more detailed analysis in Exhibit T <br />(d) adequate per narration <br />(e) Please provide an approximate mining timetable as require by this rule <br />subsection. Also state clearly that the operation will be noted for <br />intermittent status. <br />(f) For bond calculation purposes please provide the estimates tonnage and <br />final area of waste rock to be generated during the life of the mine. <br />(g) adequate per narration <br />(h) adequate per narration <br />(i) it is noted explosives will be used in the course of mining operations.