Laserfiche WebLink
Colowyo Coal Company <br />2009 Annual Reclamation and Hydrology Report <br />U <br />Figure 7-4 - South Taylor Fill Quarterly Inspection Report Continued <br />INSPECTION REPORT - SOUTH TAYLOR FILL <br />(including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER -+ 1ST 2ND 3RD 4T" ® 2009 <br />YEAR <br />FALL QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significanfchange been noted in the survey monuments on the fill? <br />No N/A Yes <br />if yes, explain: <br />Date of Survey: 12/16/2009 <br />Reviewed By: Tom Peterson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No NIA Yes Measured Level <br />if yes, explain: <br />Date of Measurement: 12/16/2009 <br />Measured By: T. Peterson <br />• <br />3) Has there been any evidence of surficlal slope failure on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of P.E. Inspection: 12116/2009 <br />Inspected By: T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of Inspection: 12116/2009 <br />Inspected By: T. Peterson <br />.?'!.0 pa0.1. GFy? <br />o? p. Pe J' <br />v ? <br />32257;C <br />Signed: , ...... <br />Ca' ?yZ?I7? <br />?s <br />/Z/ i7 /09 ?'???m1n°nnu? <br />Date: <br />Reference Permit - Volume 13, Exhibit 21, Item 1, Introductory Pages <br />CF: HSEQ 24.20.04 Revised Feb. 7, 2008 <br />• <br />Page 7-21