Laserfiche WebLink
Colowyo Coal Company <br />2009 Annual Reclamation and Hydrology Report <br />0 Figure 7-4 - South Taylor Fill Quarterly Inspection Report <br />INSPECTION REPORT - SOUTH TAYLOR FILL <br />(Including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER -> 1ST ? 2ND ? 3RD ® 4T" ? 2009 <br />YEAR <br />* ALL QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No N/A Yes <br />If yes, explain: <br />Date of Survey: 9/21/2009 <br />Reviewed By: Tom Peterson <br />• <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No N/A Yes Measured Level <br />If yes, explain: <br />Date of Measurement: 9/21/2009 <br />Measured By: T. Peterson <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of P.E. Inspection: 9/21/2009 <br />Inspected By. T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of Inspection: 9121/2009 <br />Inspected By: T. Peterson <br />`????PpO C 1?F!i <br />Q ? <br />vvsF.''gC. Pfj.•y?j+Q <br />0 2~`32267• <br />At Reference Permit - Volume 13, Exhibit 21, Item 1, Introductory Pages <br />CF: HSEQ 24.20.04 Revised Feb. 7, 2008 <br /> <br />Page 7-20